WELL COMPLETIONS AND PERFORMANCE
I-1 Inflow
Performance (1/2
day)
• Characteristics of
formation in pay zone
• Potential
of pay zones
(IPR)
• Productive life of well
I-2 Well
Completions (1 to 1-1/2 day)
• Types of well completions
Vertical
(open
hole, cased, gravel packed, …)
Horizontal (open hole,
slotted liner, cased, gravel
packed, …)
Muitilateral
wells (6 level of multilateral
completion)
• Completion selection
Vertical
vs. horizontal
Vertical
(open
hole vs. cased hole, sand
production diagnosis)
Horizontal
(open
hole vs. slotted liner,
case and cement, gravel
packed, sand problem)
• Smart wells
• Gravel
pack design
I-3 Flow in Pipes (1/2
day)
• Single-phase liquid
• Single-phase gas
• Two-phase
I-4 Perforating (1 day)
• Selecting the fluid
for
perforating
• Design of the perforations shot density
type of gun phasing
• Underbalanced and
overbalanced perforating
• Extremely overbalanced perforating
I-5 Skin
Factor Models (1 day)
• Partial
completion and slant
• Perforation
• Formation
damage
• Slotted Liner
• Gravel
Pack
• Non-Darcy flow
Tidak ada komentar:
Posting Komentar